03 Routes 4 NATIONS. 3 BORDERS. 1 SEA.
Our main line starts in Türkiye, passes through Georgia and Azerbaijan by road, crosses the Caspian by Ro-Ro ferry and reaches Ashgabat in Turkmenistan. Select a point on the map and see its role on the line.
See the points as a list01 Line map
Points on the line
Seven points are marked on the map. Three of them are our operating locations: Sarp, Alat and Turkmenbashi. The others show the line’s origin, its transit points and its destination.
Select a point; the map moves to it. You can rotate the globe by dragging it.
-
01Departure
Istanbul
- Country
- Türkiye
- Role on the line
- Head office and origin
Our head office is in Istanbul; the line on the map starts here. Loading can also take place in another city in Türkiye: the origins of our two project records are Izmir and Bursa.
-
02Border crossing
Sarp Border Crossing
- Country
- Türkiye / Georgia
- Role on the line
- Türkiye–Georgia land border crossing
The land border crossing between Türkiye and Georgia, on the Black Sea coast. Here the line leaves Türkiye and enters Georgia. It is the first border and customs crossing on the line.
-
03City
Tbilisi
- Country
- Georgia
- Role on the line
- Waypoint on the Georgia leg
The capital of Georgia. The line crosses Georgia by road from Sarp to Red Bridge; Tbilisi is the waypoint for this leg on the map.
-
04Border crossing
Red Bridge
- Country
- Georgia / Azerbaijan
- Role on the line
- Georgia–Azerbaijan border crossing
The border crossing between Georgia and Azerbaijan. Here the line leaves Georgia and enters Azerbaijan.
-
05Port
Alat
- Country
- Azerbaijan
- Role on the line
- West coast of the Caspian · Ro-Ro terminal
On the west coast of the Caspian, south of Baku. The Baku International Sea Trade Port is located here; the port has ferry and Ro-Ro terminals. The road leg ends here: the truck drives up the ramp onto the Ro-Ro ferry.
-
06Port
Turkmenbashi
- Country
- Turkmenistan
- Role on the line
- Turkmenistan’s Caspian port
A port city on Turkmenistan’s Caspian coast. The ferry berths here; the truck returns to the road. On this line, entry into Turkmenistan is through this port.
-
07Arrival
Ashgabat
- Country
- Turkmenistan
- Role on the line
- Destination
The capital of Turkmenistan and the line’s destination on the map. Both of our project records have Ashgabat as their destination.
Legend
- City
- Border crossing
- Port
- Road
- Ro-Ro sea crossing
The map is for illustration only: roads and positions are drawn approximately and are not navigation data. Live vehicle position, distance and time are not shown.
Read the route summary as text
Route summary. One: Türkiye (Turkey), by road from Istanbul to the Sarp border crossing. Two: Georgia, by road from Sarp via Tbilisi to Red Bridge. Three: Azerbaijan, by road from Red Bridge to Alat. Four: Caspian Sea, crossing by Ro-Ro ferry from Alat to Turkmenbashi. Five: Turkmenistan, by road from Turkmenbashi to Ashgabat.
Five legs
Freight from Türkiye to Turkmenistan moves in five legs: four road legs and one sea crossing.
-
Türkiye
Mode of transport: Road Istanbul – →Sarp Border Crossing
The cargo travels by road from the loading point in Türkiye to the Sarp border crossing.
-
Georgia
Mode of transport: Road Sarp – →Red Bridge
Georgia is crossed by road via Tbilisi.
-
Azerbaijan
Mode of transport: Road Red Bridge – →Alat
Azerbaijan is crossed by road; the leg ends at Alat on the Caspian coast.
-
Caspian Sea
Mode of transport: Ro-Ro Alat – →Turkmenbashi
The truck rolls aboard. The road goes on at sea.
-
Turkmenistan
Mode of transport: Road Turkmenbashi – →Ashgabat
The cargo reaches Ashgabat by road from Turkmenbashi.
What happens at the border and at the port?
-
At the border crossing
Vehicle and cargo documents are checked; exit formalities for one country and entry formalities for the next are carried out.
-
In a transit country
Under the transit procedure, the cargo crosses the country under customs supervision. Import formalities are carried out in the destination country.
-
At the port
Port and customs formalities are completed; the truck drives up the ramp onto the ferry. At the port on the other side the vehicle drives off the ferry; entry and customs formalities are carried out.
Why are distance and time not shown?
We do not publish distances, times or schedules on this page. The time taken varies with congestion at the borders, ferry departures, weather conditions and the nature of the cargo. A fixed figure would be misleading.
A time estimate is given at the quotation stage, based on current conditions.
Another route
The map shows our main line. If your origin or destination is different, write to us and we can assess that route together.
CARGO FOR THIS LINE?
Send us the place of loading and the place of delivery, and we can discuss current conditions and the time estimate at the quotation stage.
The message opens pre-filled in WhatsApp; you send it.