Project cargo and heavy lift PLAN FIRST, THEN THE ROAD.
Cargo that does not fit a standard vehicle is not moved on a standard plan. In project cargo and heavy lift, the work begins with an analysis of the cargo and the route; it continues with special permits and, where required, an escort.
What kind of cargo?
-
Out-of-gauge cargo
Cargo whose length, width or height exceeds the dimensions permitted on the road.
-
Heavy cargo
Cargo that, because of its weight, requires a special trailer, axle configuration and route.
-
Project cargo
Cargo moved as part of an investment, to a set schedule and, in most cases, in more than one shipment.
Sectors
- Heavy industry
- Construction
- Energy
Trailer types
The trailer is chosen according to the dimensions and weight of the cargo.
- Low-bed trailer
- For tall cargo. The loading deck sits close to the ground, so the overall height is reduced.
- Modular trailer
- For very heavy cargo. The number of axles is increased according to the weight of the cargo.
- Extendable trailer
- For long cargo. The deck is extended to match the length of the cargo.
How does the process work?
-
Cargo analysis
Dimensions, weight, centre of gravity and lashing points are examined from the technical drawing.
-
Route survey
Bridge, tunnel, bend and height restrictions are compared with the dimensions of the cargo; a suitable route is determined.
-
Trailer selection
The trailer is chosen to suit the cargo: low-bed, modular or extendable.
-
Special permits
Out-of-gauge and heavy cargo may require a separate permit in each country crossed; permits are obtained before transport begins.
-
Loading and lashing
The cargo is loaded onto the trailer and lashed according to the loading plan.
-
Road and escort
The cargo travels along the route determined. Where required, an escort vehicle accompanies it.
-
Delivery
The cargo reaches the delivery point. How unloading will be done, and by whom, is determined at the planning stage.
Project cargo and the Caspian crossing
For project cargo bound for Turkmenistan, the plan does not cover the road alone. The port, the Ro-Ro crossing and the road leg on the far shore are part of the same plan.
Both of the project records we have published have Ashgabat as their destination: Izmir – Ashgabat and Bursa – Ashgabat.
What we need for a quote
For this kind of cargo, a quote requires more information than for standard cargo.
- Technical drawing or dimensions of the cargo: length, width, height
- Weight per piece; centre of gravity, if known
- Number of pieces and how they are packed
- Lifting and lashing points
- Loading point and delivery point
- Facilities at the loading point and the delivery point: crane, ramp, ground conditions
- Target date range
Other main services
DIMENSIONS FIRST.
Send us the dimensions, the weight and the destination; we start the assessment with these three details.
The message opens pre-filled in WhatsApp; you send it.